View Single Post
Old 09-28-2008 | 10:04 AM
  #12  
Dash8widget
Gets Weekends Off
 
Joined: Feb 2008
Posts: 467
Likes: 0
From: SLC ERB
Default

When they build lines they must have at least 48hrs off in base before a change in direction (Trans-pacific to SA or Trans-Atlantic). I would have to do some more digging to see if there is a similar restriction in the construction of trips. In my experience (JFK ER) this does not happen. Trips that have multipule crossings are almost always to the same forign destinaion (JFK-AMS-CVG-AMS-JFK for example).
Reply