Thanks Denny. I hadn't seen that post. My only comment is that both items 1 and items 7 would have a huge impact on our lives. I would hate for significant changes to our AE process, and basing, to be effected without polling, and MEMRAT.
Above all, these changes should be looked at very, very carefully, slowly, and professionally. Item 1 in particular implies great benefits for the company, and is frought with perils for those who have to sit and wait. There will be great shifts post SOC. I don't want us to be penalized for them. They will be painful enough if we follow our contract as it is now.