View Single Post
Old 11-12-2009 | 01:03 PM
  #17674  
johnso29
Moderator
 
Joined: Oct 2006
Posts: 13,088
Likes: 0
From: B757/767
Default

Originally Posted by Bigflya
Interesting rumor being put out by the DGS guys in the ATL training center. Not sure if its hit these boards yet. DAL may get SOC on-time but with some conditions. The biggest being that the pilots will not be able to cross fleet until everyone goes through a recurrent with a syllabus heavily ephasizing CRM. Supposedly the Feds are all over the training facility and see that North and South cockpits are run two different ways. That disturbs them but they may or may not have enough power to stop the train. Also, since the syllabus has to be created it probably would not start until June, the month the new annual recurrent syllabus is started. That means a few things: 1)No joint bid for 1.5 yrs and 2) When the co moves metal it will be only N/S guys bidding their "former" metal. I do not see the co objecting too much to this because it will drastically cut the training costs that could occur from a joint post-SOC bid. Supposedly a full initial is $60k per pilot. Just another of a long line of rumors but it is as believable as others.
Not shooting your rumor down, but I'm just curious as to why anyone would think that DAL would agree to this. It just seems that this would completely defeat the purpose of SOC by not allowing the company to fully utilize cross fleeting.

Like I said, not trying to discredit the rumor. I just it would hinder more then hurt, regardless of the training footprint that results from the MOAB's.