Originally Posted by
Nosmo King
I was told moving to the DAL PWA created an additional shortfall of sim time for all the fNWA fleets due to the number of periods allowed to be used for training. Something about the DAL PWA having one LESS usable sim period per day.
The "E" period cannot be used except for West Coast guys. We generally rent that to third world airlines