View Single Post
Old 12-01-2009 | 03:30 PM
  #4  
Adlerdriver's Avatar
Adlerdriver
Gets Weekends Off
 
Joined: Jul 2007
Posts: 4,064
Likes: 37
From: 767 Captain
Default

Originally Posted by Born2AV8
CBA says Bid Pack Construction. Not sure if it makes any difference if build as a X-pairing after the fact.
I'm getting to the point now where I'd almost be surprised if the company didn't try to slip through every hole we left in the contract.

The presence of an RFO on this type of pairing is clearly a safety issue, which is why that parameter was put in the CBA in the first place.

However, WHEN the pairing was created in the bid pack construction process is obviously much more of an overriding issue than the safe operation of the pairing . Unbelievable.

Reply