Thread: ASA ORD Base
View Single Post
Old 12-05-2009 | 03:52 PM
  #19  
Av8trix
Line Holder
 
Joined: Mar 2007
Posts: 29
Likes: 0
Default

Trying to figure out current staffing levels. If I get this wrong some one correct me, since I'm a noob with this. 159 airframes currently, loosing 6, down to 154 in the spring.

I count roughly 1375 total active (bids awarded) pilots

so.. 1375 / 154 = 8.9 pilots or 4.45 crews per a/c?

That sounds a lot tighter than I would have expected, am I borking the math/aircraft/pilot counts somewhere?
Reply