Originally Posted by
acl65pilot
Dragon, as with most things, each scheduler has their own method. Really, it is not a department policy on how they assign it. Some do as you say, others do it by seniority, others just assign it by bypassing the first two or three than all of the four day guys or on international categories all of the five day plus guys.
Point is there is no set method in which to derive expectations from.
Just when I thought I had found the rosetta stone. Go ahead throw cold water on the idea