Originally Posted by
fishguy79
That Nov 2010 is the min staffing. the actual bodies report is always higher. for example from the last bid in dec the 22 d 2 report showed DTW 755 B as 171(this is min staffing) The 22 d 3 report that came out AFTER the bid was publised show the category acutal bodies as 200. So that category has 29 people in it over the min required by contract. I do not believe they can run the airline at min staffing (the 22 D 2 number)
Correct. It would by ugly.