Originally Posted by
fishguy79
Dont confuse the 2 reports PG. 22 D 3 is the bodies report and the new one will not be out until after the bid results are posted. the 22 d 2 for the 22 d 3 report that is shown is dated 12/2009 and the required staffing for it shows 9383. That is the report that was removed.
clear as mud, no
Got it. Thanks for the clarification.