I forgot to take into account for those flowing up. Everyone left behind will move up by 45 this year plus 108 in 2011. So if you are currently 750 on the list, you will be roughly 600 on the list. And if you are 800 on the list right now, you will be at the bottom of the list at the end of 2011 (#650).
If DAL continues to hire in 2011, Mesaba MEC needs to renegotiate to increase the number of flowthru per month from 9 to something higher like 20 because Mesaba can handle 20 per month through the end of 2011 without additional expense as XJ has 1175 on the pilot roster.