View Single Post
Old 06-23-2010 | 08:40 PM
  #41333  
Denny Crane's Avatar
Denny Crane
Gets Weekends Off
 
Joined: Sep 2008
Posts: 6,971
Likes: 0
From: Kickin’ Back
Default

Originally Posted by TOGA LK
My primary complaint is with setting up an aircraft and then loosing it on the next turn with a :40 hub turn. Then the inbound aircraft is late and the inbound aircraft has 4 MELs. So each pilot is digging through a 10-day history of the bird (required on NWA metal) to the tune of 20 to 60 pages of entries and then having to research every MEL and make safe they are applied. Of course all of this is in the 10th to 15th hour of your duty day. Seriously, what is up with this continuous turn over in equipment?
So let me get this straight, you are required to go thru 10 DAYS worth of write ups that have already been cleared by MTC on former NWA aircraft and look up every MCO even if it was cleared? I missed the memo on this one. I understand the need to look at the history of the last few days and the need to look up any open MCO's from the logbook in the MEL but to look up write ups that have been cleared by MTC more than a few days before seems fairly ridiculous to me.

Denny