Originally Posted by
Red Forman
I think most of you forgot that Comair already did this. The only catch was no one else had the balls to do the same, instead they lowered the bar even further. End result, we had to take pay cut after pay cut to be in line with all the other regionals.
Sometimes being a sub-contractor is a biatch. The lowest bidder usually wins out in the sad world of subbing.