Originally Posted by
TurboMD88
How can you reduce the excitement of Working for the world greatest airline? All the new hires got a list of avail bases and eqpt last week and were required to have their bids submitted no later than Aug 10th via email. Looks like the 1st class will have 30 bodies in the chairs with 8 or 9 not being present (compass/mesaba) flow ups being held till they can be replaced..Hopefully they can get on campus quick. As for the tube have a great time and dink a cold one for everyone ;-)

Actually there are 29 (20 CPZ and 9 XJ) being withheld until 11/8 class. This class was for 59 with 2 being furloughs.