Originally Posted by
mmaviator
So why not DH to ONT and make the ride a little shorter or am I preaching to the choir?
Well, they use LA-based guys for the 73N so no DH required. Not sure there's enough DAL traffic through ONT to make that feasible for the other equipment that comes out of VCV.