View Single Post
Old 11-19-2010 | 08:47 PM
  #77  
dojetdriver
Gets Weekends Off
 
Joined: Feb 2006
Posts: 3,732
Likes: 0
From: DD->DH->RU/XE soon to be EV
Default

Originally Posted by RamenNoodles
Hey random thought. Can an XJT guy post the pre-concession rates on here? Would love to see what we need to get back to.
Ask and you shall receive. The rates are for 12/01/09, the last year for an LOA for a contract extension that was signed. All rates are 145, there are 135 rates in the table. Not applicable as we don't have them on property, anymore;

CA
1 65.28
2 67.24
3 69.25
4 71.33
5 73.47
6 75.67
7 77.19
8 79.50
9 81.89
10 84.35
11 86.88
12 89.48
13 92.17
14 94.93
15 96.83
16 98.77
17 100.74
18 102.76

FO

1 24.50
2 36.47
3 38.73
4 41.31
5 42.55
6 43.82
7 45.14
8 46.49

I'd like to see these with standard 3-6% per year added for every year until new rates are signed as the baseline for negotiation. For the 50 seat equipment at least. Horizon's 700 rates should be used for the larger stuff.

I KNOW, it's nothing but voiding a bladder into the effects of a pressure differential.
Reply