Originally Posted by
Doug Masters
Question for the PBS gurus: I want to bid reserve to hold weekends off but only if I can get every Sat Sun Mon off. Do I preference those days off and then do "all or nothing" followed by my default bid?
Thanks
Put all of the requested dates off on the same bid line with an Else Start Next at the end of that bid line. Then in the next bid group build your bid as a line holder.
One caution is that you may not be able to get all of the weekends off due to blocks of days off maximum. IF there are 5 weekends and your category is limited to only four blocks of days off, you will not be able to get one of them. You will also need to make sure that you satisfy the minimum number of days on in between blocks of days off.
Hope this helps.