View Single Post
Old 12-02-2010 | 06:08 PM
  #53906  
Jesse
Banned
 
Joined: Jul 2010
Posts: 793
Likes: 0
Default

Originally Posted by RockyBoy
We are talking about after PBS awards you a line. What you request in PBS is not what you always get. If PBS can build it and we can request it when bidding, we should be able to move X days using the same rules. The big three are one day off between blocks, more than a block of six on call days, and creating a block of two reserve days. PBS does that all day long when building lines, yet we can't do it after the schedules are published by moving X days.

PBS is getting very good at building reserve lines that virtually prohibit you from moving X days due to these requirements. For December it gave me three blocks of three days reserve and one block of two days reserve virtually locking up my ability to move 11 of my days regardless of coverage. It then gives me one day off after the block of two then 6 days reserve. Kinda be nice to move one of the FOUR days left I can move due to these rules into that one day off so I don't have a single day off, but I can't create a block of more than 6 even though PBS does it. So for December I have a total of 6 days in one block that could potentially be moved, but they are the ones that PBS unstacked on me so the coverage won't allow it. I'm not a consipiracy theorist type, but it's been uncanny the last couple of months how efficient PBS is getting at building lines like this that prohibit you from moving days even if coverage is good.
I just know that it blows.