View Single Post
Old 01-15-2011 | 05:36 PM
  #57064  
acl65pilot's Avatar
acl65pilot
Happy to be here
 
Joined: Jun 2006
Posts: 18,563
Likes: 0
From: A-320A
Default

Originally Posted by sailingfun
The 767 is actually still in production and has a significant backlog. UPS has deliveries that extend to the end of 2012. ANA ordered 9 aircraft that are in production now. The total backlog is 50 airframes and with or without the tanker order the line will remain open for 2 more years.
Correct, and with the tanker order it will stay open. After this backlog is done, and no order it will be shuttered.

Last edited by acl65pilot; 01-15-2011 at 05:51 PM.