One variable to this moving flying to Atlanta discussion that I've not seen discussed is the addition of International concourse F. Although 12 to 16 gates might not sound like much, it relocates jets that do not have a lot of movements out of T concourse and other areas at the airport that are scheduled for much tighter turns, leveraging their new found availability. Delta's challenge, with Southwest coming to town, is going to be to fill Hartsfield Jackson back up again, as it has always done to both maximize connecting opportunities for passengers and keep out competitors.

Specs for the new facility, set to go on line in April 2012 are:

* 1.2 million square-foot terminal and concourse complex, large enough to accommodate 13 New World of Coke museums
* 12 wide-body capable international gates, convertible to 16 narrow-body capable gates
* In-line baggage screening system
* 9 security checkpoint lanes for international departing passengers
* 6 security recheck lanes for domestic connecting passengers
* 1,100 short-term parking spaces in close proximity to the terminal
* New facility will ease load on existing domestic gates by providing gate capacity during international non-peak times
Bar, you ever seen this?

http://www.aviationweek.com/media/images/devatl.jpg

By the way, I think I have our IROPS issue solved. Especially when gates become an issue.