Originally Posted by
dragon
I'm thinking they'll use the pull the band aid off the scab all at once method so that even though it will hurt, it's not drawn out.
However, with the training pipelines backed up on the 320 and ER, they may elect to only bump a little at a time so they aren't left in a situation where they need to keep some of the 9s a little longer and don't have anyone left to fly them.
So, I think they'll put the whole thing on the 365 day bid that is rumored to be out in May.
Thanks dragon. I forgot about the possibility of the 365 day bid....