Originally Posted by
flyingreasemnky
I'm still on reserve here in IAD but for the April bid period there are only 7 reserve lines. I finished IOE just before Christmas and it looks like I'll have a line in May or June especially with the opening of the BOS base. I'm third from the bottom on the Saab and the person one spot above (he's from my Sep class) has a standup line this month. You have a lot better chance of holding a line on the Saab then on the Q. Last time I checked, there were 85 people below me on the Q and I would hold a line on it. There are at least 60 people (company wide) on the Q between you and a line.
If we did get the Saab where do you think we would be needed most? Iad?