Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Air Wisconsin (https://www.airlinepilotforums.com/air-wisconsin/)
-   -   Air Wisconsin or Republic ? (https://www.airlinepilotforums.com/air-wisconsin/108248-air-wisconsin-republic.html)

pitchtrim 09-21-2017 02:32 AM

Just above mesa? That's funny.

Swakid8 09-21-2017 02:57 AM

Lol Air Wiskey above Mesa, that's funny.


Sent from my iPhone using Tapatalk

chrisreedrules 09-21-2017 07:48 AM


Originally Posted by mpet (Post 2433645)
.... Air Wisconsin is and has historically been regarded as one of the best regional airlines to work for. Their minimums were higher than everyone's, their pay was higher than everyones, their insurance, their contract, their training has been better or as good as any other. They are the exact opposite of a bottom feeder, and your CFI buddies said they're a Mesa? Your CFI buddies are retarded.

This... Sounds like people are trying to make themselves feel better about working for Mesa.

ChrisPilot1 09-21-2017 08:51 AM

One more question, thanks everyone for the responses. Are these bonuses taxed at a compounded or flat rate of 25%?

WhiskeyDelta 09-21-2017 08:56 AM

Air Wisconsin or Republic ?
 

Originally Posted by ChrisPilot1 (Post 2433798)
One more question, thanks everyone for the responses. Are these bonuses taxed at a compounded or flat rate of 25%?


It doesn’t matter what regional you work for. If it’s paid as a bonus, they are all taxed as a bonus at 25%. If your effective tax rate ends up being lower when you file you get some back.

ChrisPilot1 09-22-2017 11:24 AM

I had chosen Wisconsin and got scheduled for a ground school but honestly reading through the last 100 or so pages of the main thread here im having second doubts.

1) Alot of people are saying the company is pretty much BS'ing the upgrade times and 18-24 months is simply projeted right now. How is this looking for a guy entering ground school next month?

2) Reserve times , I was told that reserve would be 2-3 months in ORD at the most. Still holding true?

3) ALOT of complaints over management over working pilots, not caring and schedules constantly changing?

mcat 09-22-2017 12:10 PM


Originally Posted by ChrisPilot1 (Post 2434474)
I had chosen Wisconsin and got scheduled for a ground school but honestly reading through the last 100 or so pages of the main thread here im having second doubts.

1) Alot of people are saying the company is pretty much BS'ing the upgrade times and 18-24 months is simply projeted right now. How is this looking for a guy entering ground school next month?

2) Reserve times , I was told that reserve would be 2-3 months in ORD at the most. Still holding true?

3) ALOT of complaints over management over working pilots, not caring and schedules constantly changing?

1. & 2.) We shall see what they end up being. We are still short on pilots and we need to just about double our pilot group in size to be properly staffed. So new hires will move up in seniority fast. Running classes of 15-25 every two weeks. We have about 50 pilots right now either in ground school, CPT, sim, or on IOE.

3.) It is true. But once we get more pilots here, that will go away for the most part.

pitchtrim 09-22-2017 12:47 PM

When I got hired they said reserve was 6 months to a year. I sat reserve for 2 weeks. Upgrade time was 6 years. I upgraded in 4. Point is there's no way to predict all this stuff perfectly but fact is they need to hire a few hundred guys like yesterday. If you get in on the front end of that wave, regardless what the bitter online people say, odds are you will upgrade in a short period of time. Not everyone is exactly cut out to upgrade in 18 months anyways. If it takes 2 or 3 years that's still very quick. They even pay you 8k if you don't upgrade!

toolowterrain 09-22-2017 04:21 PM


Originally Posted by ChrisPilot1 (Post 2434474)
I had chosen Wisconsin and got scheduled for a ground school but honestly reading through the last 100 or so pages of the main thread here im having second doubts.

1) Alot of people are saying the company is pretty much BS'ing the upgrade times and 18-24 months is simply projeted right now. How is this looking for a guy entering ground school next month?

2) Reserve times , I was told that reserve would be 2-3 months in ORD at the most. Still holding true?

3) ALOT of complaints over management over working pilots, not caring and schedules constantly changing?

Better than PSA saying saying flow to American in 6. Ha!


All times are GMT -8. The time now is 03:07 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands