Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Cargo (https://www.airlinepilotforums.com/cargo/)
-   -   FDX Open Time (https://www.airlinepilotforums.com/cargo/70897-fdx-open-time.html)

Kolohe 11-02-2012 07:14 PM

"Open Time" -- Not Really
 
Company historically leads the industry with innovative IT solutions and Express spends significant time/effort/monies on gadgets such as HUDs, EFBs, new Webmail and possibly iPads to enhance the operation, yet Express refuses to garner open time (real time) trip trading capability to increase efficiencies that benefit both aircrew QOL and scheduling effectiveness/efficiency. CRS operates behind some Wizard of Oz curtain and is not seemingly accountable to Flight Management. From what I see, the SCP and Fleet Captains appear to have little influence with key scheduling processes—consistent VTO construction that ignores aircrew input, scheduling errors that violate contract provisions, scheduling actions that leverage contract ambiguity, et al.

When compared to the majority of other airlines trip trading standards, FDX open time “trip trading” is an inefficient, onerous, archaic process with limited credibility. Exactly what parameters generate “Insufficient Reserve” trade rejection? Why do I receive an “Insufficient Reserve” rejection when attempting a trade into the very same trip footprint or a longer trip that extends beyond the footprint? Wouldn’t the latter benefit the existing reserve situation? Why do I seem to always receive “Disapproved—Earlier Time Stamp” after an extended wait, and the trip was assigned to a make-up recipient vice someone trading between two trips? Did they wait for the make-up request to minimize the impact on reserves? How do you explain the unusual number of charter/XTRA parings that are consistent or repetitive in specific calendars? Where is the transparency in these processes?

Twenty years ago at a different airline, I hit the enter button and my trade was either immediately executed or immediately denied with a clear explanation. Exactly what control or manipulation is required to be maintained with the current FDX “trip trading” system? FDX really does not have “open time trip trading” available to aircrew; it is a bid line adjustment request lobbed over a nebulous curtain to be considered by a scheduler du jour without transparent auditing. The CRS stovepipe has not been read into the Just Culture apparently, nor are they accountable to the initiative advocates.

Not to worry though…we have been assured that it is a hot-ticket item on the NC’s radar—for the past few years I believe….

Gunter 11-02-2012 07:30 PM

Great post.

One clarification - Scheduling is absolutely not accountable to flight ops. They are a different department. GOC and jumpseats are also not accountable to flight ops.

A300jetflyer 11-02-2012 08:45 PM


Originally Posted by Gunter (Post 1286795)
Great post.

One clarification - Scheduling is absolutely not accountable to flight ops. They are a different department. GOC and jumpseats are also not accountable to flight ops.

Gunter,

Of the departments you have listed, only GOCC is not under the AOD umbrella. GOC was formed in the early 90s by combining Flight Control (aka dispatch) and Systems Control (aka service recovery). Systems Control was under the CSSD (Central Support Services Division), Flight Control was under AOD. Sr. VP T.W. that dealing with ALPA 1 was filling his plate, so when the reorg was approved he allowed the newly formed GOC to be assigned to CSSD Sr. VP M.A.T.

As stated previously, Crew Scheduling and Jumpseats remained under the AOD umbrella.

Dadof6 11-02-2012 09:12 PM


Originally Posted by Kolohe (Post 1286782)
Company historically leads the industry with innovative IT solutions and Express spends significant time/effort/monies on gadgets such as HUDs, EFBs, new Webmail and possibly iPads to enhance the operation, yet Express refuses to garner open time (real time) trip trading capability to increase efficiencies that benefit both aircrew QOL and scheduling effectiveness/efficiency. CRS operates behind some Wizard of Oz curtain and is not seemingly accountable to Flight Management. From what I see, the SCP and Fleet Captains appear to have little influence with key scheduling processes—consistent VTO construction that ignores aircrew input, scheduling errors that violate contract provisions, scheduling actions that leverage contract ambiguity, et al.

When compared to the majority of other airlines trip trading standards, FDX open time “trip trading” is an inefficient, onerous, archaic process with limited credibility. Exactly what parameters generate “Insufficient Reserve” trade rejection? Why do I receive an “Insufficient Reserve” rejection when attempting a trade into the very same trip footprint or a longer trip that extends beyond the footprint? Wouldn’t the latter benefit the existing reserve situation? Why do I seem to always receive “Disapproved—Earlier Time Stamp” after an extended wait, and the trip was assigned to a make-up recipient vice someone trading between two trips? Did they wait for the make-up request to minimize the impact on reserves? How do you explain the unusual number of charter/XTRA parings that are consistent or repetitive in specific calendars? Where is the transparency in these processes?

Twenty years ago at a different airline, I hit the enter button and my trade was either immediately executed or immediately denied with a clear explanation. Exactly what control or manipulation is required to be maintained with the current FDX “trip trading” system? FDX really does not have “open time trip trading” available to aircrew; it is a bid line adjustment request lobbed over a nebulous curtain to be considered by a scheduler du jour without transparent auditing. The CRS stovepipe has not been read into the Just Culture apparently, nor are they accountable to the initiative advocates.

Not to worry though…we have been assured that it is a hot-ticket item on the NC’s radar—for the past few years I believe….

Shack...+1. After being called for draft (MEM A300FO) three times in the last three days, I offered a quid pro quo to the scheduler today: if you can drop the carryover trip starting in two days that's been "Denied: Insufficient Reserves," I'll sit your ASTBY tonight. She apologized but said she physically couldn't make that happen. It's a shame when the schedulers' hands are tied--just like ours are. So I'm enjoying a night at home tonight. And peak is just beginning...

portfo 11-02-2012 09:15 PM

Any truth to the rumour the ex CHQ scheduler Joe C. Is at FedEx now? If so, welcome to the new suck....

9ESOCCFI 11-02-2012 10:21 PM

Hey folks. As a scheduler I am willing to trade jobs with you anytime. You name the date.

Kolohe 11-03-2012 03:23 AM

CRS Umbrage
 

Originally Posted by 9ESOCCFI (Post 1286841)
Hey folks. As a scheduler I am willing to trade jobs with you anytime. You name the date.

While your comment may reflect a genuine desire to join the FedEx aircrew corps (based on your growing qualifications), your remark also exposes a predisposition which may be prevalent among some of your CRS rank and file—an inherent resentment toward the aircrew force. This may serve to explain obstinate CRS commentary and the narrow latitude that I have witnessed from a select few, and may serve to influence a particular CRS scheduler’s unwillingness to consider VTO input or facilitate other specific aircrew requests/administration during operations.

Interesting you choose to address a “job swap” vice counter/clarify the assertions made in previous posts highlighting CRS’ process deficiencies. Telling. Perhaps you can provide some insight into CRS open-time trading practices and VTO input consideration to provide clarity.

Huck 11-03-2012 04:00 AM


Originally Posted by 9ESOCCFI (Post 1286841)
Hey folks. As a scheduler I am willing to trade jobs with you anytime. You name the date.

OK.... the date that I start a four-leg PANC-KEWR trail of tears..... I'll sit in Memphis, drink coffee and say "no" and you can get 4 hours of sleep a day for a week.

flextodaline 11-03-2012 04:34 AM


Originally Posted by Huck (Post 1286862)
OK.... the date that I start a four-leg PANC-KEWR trail of tears..... I'll sit in Memphis, drink coffee and say "no" and you can get 4 hours of sleep a day for a week.


now that's dang funny!!:D:D:D

Gunter 11-03-2012 05:33 AM


Originally Posted by A300jetflyer (Post 1286823)
Gunter,

Of the departments you have listed, only GOCC is not under the AOD umbrella. GOC was formed in the early 90s by combining Flight Control (aka dispatch) and Systems Control (aka service recovery). Systems Control was under the CSSD (Central Support Services Division), Flight Control was under AOD. Sr. VP T.W. that dealing with ALPA 1 was filling his plate, so when the reorg was approved he allowed the newly formed GOC to be assigned to CSSD Sr. VP M.A.T.

As stated previously, Crew Scheduling and Jumpseats remained under the AOD umbrella.

That's good to know.

I was thinking about who is accountable to PC/BM, the only supervision that interfaces with us.

JP is head of AOD, right? I really don't think the other departments allow feedback from the System Chief Pilot / Overall Fleet Captain.


All times are GMT -8. The time now is 07:02 PM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands