FDX - When would you ...
The Letter of Agreement for Introduction of Boeing 767F Aircraft says,
A B757 bid period package shall not contain B767 flight segments, unless authorized by the ALPA Scheduling Committee Chairman. OK, so put yourself in the shoes of the ALPA Scheduling Committee Chairman. When would YOU authorize the inclusion of a B767 flight segment in the B757 bid period package? . |
Why don't you just ask him, Tony?
|
Originally Posted by TonyC
(Post 1377719)
The Letter of Agreement for Introduction of Boeing 767F Aircraft says,
A B757 bid period package shall not contain B767 flight segments, unless authorized by the ALPA Scheduling Committee Chairman. OK, so put yourself in the shoes of the ALPA Scheduling Committee Chairman. When would YOU authorize the inclusion of a B767 flight segment in the B757 bid period package? . There is always going to be exceptional language in a contract to provide for unusual relief. I'm just glad we are the gatekeepers on this matter and not say the VP of flight operations or his designated representative. |
Originally Posted by Laughing_Jakal
(Post 1377870)
Ok so I am in his shoes now (hypothetically) and my answer is Never.
There is always going to be exceptional language in a contract to provide for unusual relief. I'm just glad we are the gatekeepers on this matter and not say the VP of flight operations or his designated representative. +1...............;) |
Correct me if I am wrong but in the video it is mentioned, if a 757 pilot flies a trip with one leg that has a 767 then the whole trip is paid at widebody? Hence, why would you not include a 767 segment as often as possible?
|
Just pay the 57 wide-body, and be done.
|
Originally Posted by Full pull
(Post 1377997)
Just pay the 57 wide-body, and be done.
|
Originally Posted by Full pull
(Post 1377997)
Just pay the 57 wide-body, and be done.
Originally Posted by RedeyeAV8r
(Post 1377998)
If it were only that easy.
|
Originally Posted by Full pull
(Post 1377997)
Just pay the 57 wide-body, and be done.
» Huffington Post seeks people who have had sex with aliens (15 have responded) JIMROMENESKO.COM |
Originally Posted by TonyC
(Post 1377719)
The Letter of Agreement for Introduction of Boeing 767F Aircraft says, A B757 bid period package shall not contain B767 flight segments, unless authorized by the ALPA Scheduling Committee Chairman. OK, so put yourself in the shoes of the ALPA Scheduling Committee Chairman. When would YOU authorize the inclusion of a B767 flight segment in the B757 bid period package?
Originally Posted by XprsFr8r
(Post 1377726)
Why don't you just ask him, Tony? "What criteria will the Scheduling Committee Chairman use to allow B-767 flying in the B-757 bid period package?" The response was an explanation of who the Scheduling Committee Chairman is, what his job description is, and what his experience is.No criteria was given, nor was there an example offered of when it might be considered, or why the clause exists. Is our seniority now being treated like another Scheduling Soft Parameter? . |
All times are GMT -8. The time now is 12:24 AM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands