AE Results Posted
#1
Super Moderator
Thread Starter
Joined APC: Dec 2007
Position: DAL 330
Posts: 6,868
AE Results Posted
AE is out. ATL M88As pretty much went everywhere. Also a bunch of secondary displacements including both V & M displacements, which I really did not think would happen. A whole bunch of plug and plug + guys were bumped out - mandatory displacements all the way from 777A down to 350 Bs. Voluntary down to 320 B. Total bummer for the mandatory guys.
Kind of weird coming out around 10PM PDT.
Scoop
Kind of weird coming out around 10PM PDT.
Scoop
#2
Line Holder
Joined APC: Aug 2017
Posts: 94
Maybe they were waiting until after midnight in ATL for some reason. Would that buy them a little longer extension on somebody’s freeze? Or position the 365 day conversion window the way they want?
That put the official release time into May as well, but not a new bid period. I haven’t had any coffee yet so might be over thinking it.
Agreed that it’s strange. I’ve never seen one come out in the middle of the night before.
That put the official release time into May as well, but not a new bid period. I haven’t had any coffee yet so might be over thinking it.
Agreed that it’s strange. I’ve never seen one come out in the middle of the night before.
#5
Gets Weekends Off
Joined APC: Feb 2008
Posts: 19,273
Well that’s apparently exactly what happened. Not everything is a conspiracy and they dated the bid as posted 30 Apr so it had nothing to do with trying to delay it into another month.
I am sorry your life at Delta is so bad. The fifty plus greenslips you brag about in the last 3 years must be wearing you out.
I am sorry your life at Delta is so bad. The fifty plus greenslips you brag about in the last 3 years must be wearing you out.
#7
Cloudbase
Joined APC: Nov 2005
Position: 717A
Posts: 532
Dtw717 is a good example of why we're going to be a shtshow in 2023 with nearly 1,000 retirements annually. Displace 3 on a 3rd level secondary (tertiary?), As opposed to absorbing it for a few months. I bet by the time those guys train, they're coming back. Seems quite inefficient.
#8
Gets Weekends Off
Joined APC: Feb 2008
Posts: 19,273
There should be another bid out in about 60 days give or take so you will have a opportunity to possible change bases if you can remain on the same equipment. I don’t believe there are any long delays in the pipeline. OE can sometimes be backed up but again that’s equipment specific.
#9
Gets Weekends Off
Joined APC: Sep 2006
Posts: 1,233
Actually, it is very possible that someone from CR/alpa stayed up way late after their working hours to finish the awards. I have seen this before. That's the Delta difference and it does exist!
145 awards/120 displacements.
53 A to B, small AE, but largest number of loosing Capt seats for the past year.
9 bypasses
While it sucks to be displaced, but with the slow down in hiring it is the best time to re-train the guys.
The junior Capt is ATLM88 at 12521, June 2016 hire.
145 awards/120 displacements.
53 A to B, small AE, but largest number of loosing Capt seats for the past year.
9 bypasses
While it sucks to be displaced, but with the slow down in hiring it is the best time to re-train the guys.
The junior Capt is ATLM88 at 12521, June 2016 hire.
#10
If any of you are on the Widget FB group you can see posts by Chris Miskell that stated that the AE was done but that lady who does it was at the DTW base visit, then headed to MSP (she likely finished it then sent it to ALPA for review as she headed to DTW). He said she would post it as soon as she could after getting to MSP. It looks as if that's actually what happened and I'm quite surprised she worked so late into the evening. Good on her...Lord knows many of us would have said screw it and waiting until the following day. The AE is dated 30Apr, so that throws out one of the conspiracy theories.
Thread
Thread Starter
Forum
Replies
Last Post