Search
Notices

CVG

Thread Tools
 
Search this Thread
 
Old 03-18-2024, 09:23 AM
  #1  
Gets Weekends Off
Thread Starter
 
sargeanb's Avatar
 
Joined APC: Aug 2006
Position: E170 CA
Posts: 200
Default CVG

So I'm a senior-ish captain at RPA. I'm with the training dept, making between 205-240 an hour depending on if I'm instructing or not. I live 20 mins from CVG, and have been making the drive to CMH or IND for over a decade. I have zero desire to commute (flying), hence why I'm looking for options nearby. I'm fairly happy with the job, especially the instructing part, but the line flying...one gets tired of 4 legs through the NE every day. That, and I wonder if RPA will still be around in 20 years when I'm ready to retire. A few questions:

1. Does it seem like CVG will be a long-term base for Frontier?

2. What are the odds of getting it out of training?

3. If you were in my position (see above), would you make the jump to Frontier?

Thanks all.
sargeanb is offline  
Old 03-18-2024, 10:39 AM
  #2  
Gets Weekends Off
 
SeaRider's Avatar
 
Joined APC: Oct 2011
Position: El Capitan de Airbii
Posts: 277
Default

Originally Posted by sargeanb View Post
So I'm a senior-ish captain at RPA. I'm with the training dept, making between 205-240 an hour depending on if I'm instructing or not. I live 20 mins from CVG, and have been making the drive to CMH or IND for over a decade. I have zero desire to commute (flying), hence why I'm looking for options nearby. I'm fairly happy with the job, especially the instructing part, but the line flying...one gets tired of 4 legs through the NE every day. That, and I wonder if RPA will still be around in 20 years when I'm ready to retire. A few questions:

1. Does it seem like CVG will be a long-term base for Frontier?

2. What are the odds of getting it out of training?

3. If you were in my position (see above), would you make the jump to Frontier?

Thanks all.
1. It's anybody's guess. The only constant at F9 is change.

2. Very good.

3. Only if you want out of training and want to go fly the line for a paycut. You won't make $205 until upgrade, call it 2 years-ish, and $240 will take several years due to our ridiculous pay slope.
SeaRider is offline  
Old 03-18-2024, 12:29 PM
  #3  
Gets Weekends Off
 
SeaRider's Avatar
 
Joined APC: Oct 2011
Position: El Capitan de Airbii
Posts: 277
Default

Caveat to #2 above. By the time you'd onboard the SJU base will be open and is likely to be the most junior base. So you could get that out of training before getting CVG.
SeaRider is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
anothermilguy
Atlas/Polar
19
07-30-2023 11:38 PM
BoilerUP
Cargo
166
02-27-2018 09:37 AM
jetliner1526
Southwest
0
01-04-2017 10:09 AM
dragon
Major
32
12-21-2008 04:28 PM
JetFlyer06
Regional
34
09-01-2008 11:26 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices