![]() |
Originally Posted by BornToFly
(Post 217020)
haven't heard that yet, are those the 900's and if not what are they and are they gonna open up a new base
|
Airsupport, where did you hear about SLC and LAX?
|
thought they were only going to fly about 15 of the 900's for delta, never heard anything close to 30-40
|
I think he's just starting a new rumor:)
|
how bout raising the pay instead of lowering minimums.... grow some balls Pinnacle.
|
Grow some balls Pinnacle? What about the rest of the Regional world? Everybody's mins have dropped.
|
Originally Posted by Window_Seat
(Post 218644)
how bout raising the pay instead of lowering minimums.... grow some balls Pinnacle.
|
Originally Posted by BornToFly
(Post 217195)
thought they were only going to fly about 15 of the 900's for delta, never heard anything close to 30-40
|
Hi!
I heard they are flying 25 for DAL, and losing 15 for NWA, for a net gain of 10. The BIG problem, aside from the fact that they can't staff the fleet they have now, is that they're staffed at about 3.0 crews/aircraft. The DAL contract requires 5.0 crews/aircraft for their 25 jets. Good luck with that!!! PSA, USA Jet and Mesa? (if not one or more other airlines) also have no published minimum hours. I have heard that more than 1 regional is actually hiring guys with NO commercial! WHen they pass their -121 checkrides, they are also awarded their commercial. Ab-initio is next. cliff ILN |
Originally Posted by atpcliff
(Post 219035)
Hi!
I heard they are flying 25 for DAL, and losing 15 for NWA, for a net gain of 10. The BIG problem, aside from the fact that they can't staff the fleet they have now, is that they're staffed at about 3.0 crews/aircraft. The DAL contract requires 5.0 crews/aircraft for their 25 jets. Good luck with that!!! PSA, USA Jet and Mesa? (if not one or more other airlines) also have no published minimum hours. I have heard that more than 1 regional is actually hiring guys with NO commercial! WHen they pass their -121 checkrides, they are also awarded their commercial. Ab-initio is next. cliff ILN |
| All times are GMT -8. The time now is 03:09 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands