Thread: Cargo Cut-out
View Single Post
Old 12-27-2011, 08:18 AM
  #10  
4A2B
Gets Weekends Off
 
Joined APC: May 2009
Posts: 556
Default

Originally Posted by The Walrus View Post
You may want to check our contract.

  1. A domestic rest period shall be scheduled for not less than 9 hours (8 hours when the following duty period consists entirely of deadhead to base), and shall operationally be not less than 8 hours.
this is what mine says

3. Domestic Crew Planning Limitations
Crew Planning limitations shall apply until 48 hours prior to showtime of a trip or series of trips, except that such limitations do not apply to a sequence of trips that includes an optional assignment (e.g., make-up, trip trade, volunteer or draft). Trips constructed and revisions that occur after that time shall be governed by Section 12.C.4. through C.6., as applicable.
a. Layover Minimum
A layover preceding duty as an operating pilot shall be scheduled for at least 10:15 hours. A layover preceding deadhead duty may be scheduled to a minimum of 8 hours.

you are probably quoting the operational rules, not pre planning or bid packs.
4A2B is offline