View Single Post
Old 02-09-2012 | 03:42 PM
  #7446  
Bucking Bar's Avatar
Bucking Bar
Can't abide NAI
 
Joined: Jun 2007
Posts: 12,078
Likes: 15
From: Douglas Aerospace post production Flight Test & Work Around Engineering bulletin dissembler
Default

Originally Posted by Carl Spackler
SWAPA scope. Period. The strategy to achieve it is to end negotiations by accepting nothing less than the SWAPA contract in it's entirety. It would have the added benefits of achieving close to C2K pay restoration, much better duty rigs, much better health care, etc. It's also a strategy that would make it extremely difficult for the NMB to refuse.

Carl
Originally Posted by scambo1
I agree completely with Carl on this. It has the added benefit of being a defensible position.
Good answer. What about International?

Last edited by Bucking Bar; 02-09-2012 at 08:48 PM.
Reply