According to the guys in the cpo, the reason we hired last time was they offered too many long term leaves. As the economy shifted they could not get furlough bypass pilots or pilots off of leave. As a result they needed to hire to staff the summer block hr plan.
I was told this after I enquirered about a three year loa and was told the latest they would grant was the end of 2012 or March of 2013.