View Single Post
Old 11-20-2012 | 08:00 AM
  #46  
757niteflyer
Line Holder
 
Joined: Jul 2012
Posts: 92
Likes: 0
Default

I was under the understanding their is a 30 percent reserve crews requirement the contract calls for. Maybe the 30 percent number isn't a contractual requirement, maybe it's a number that is being planned for because the contract requires more staff (increased time off, training done on days on). Either way the company is planning a 30 percent increase in staff when the contract goes into effect. That means if the 72 goes away we have enough staff on property to staff the 75, if the 72 doesn't go away, we are going to have to increase staff to meet contractual needs.

The fence I'm talking about is the fence that's going to go up, not because of JCBA but because people need to be trained. I'm taking a guess at a year before people are trained before people can start bidding other equipment, maybe longer maybe less, but their will be a period of time before everyone can start bidding outside their own equipment.

My point is we added an airplane, we had to recall for that aircraft. The New hire + people think its a move against them, I still haven't figured logic. We add an airplane but we don't staff it ?
Reply