Originally Posted by
ewr756drive
cannot get an answer on the other thread. What is JH/l-ual problem with l-cal running a system bid that has been slated for release for over 6 months????
I'm not sure. What does the JCBA say about staffing? I'm guessing this is in LOA 26 or whatever. I'm sure no one cares, as long as its within the JCBA.