Originally Posted by
APC225
Which still won't be enough when you're near the bottom. Sometimes there are so few trips left that PBS can't find a way to them on your line with the default settings. I would suggest at least
Waive Day Off, Min Days Between Work Blocks, 1
Award Work
Or the full Hail Mary bid group as the last one. Twice this year I've had Award Work as my second to last BG, didn't get it, but used the above as my last bid group, and got it. That waive is not too painful. Better than reserve.
I thought that if you were at or above the g-line and asked for a line you were guaranteed one per the UPA. PBS would hit bidders from the constraint line and below with "solution constraints" to ensure that there were enough leftover trips to build lines all the way down to the g-line guy (using denial mode if need be). Are you talking about being below the g-line and trying to get a move up line if one becomes available?