View Single Post
Old 09-25-2014 | 11:27 AM
  #74  
SUX4U
Gets Weekends Off
 
Joined: Oct 2009
Posts: 1,288
Likes: 0
From: B756 FO
Default

Originally Posted by John Carr
When I did my M&G, THAT SPECIFIC CP had almost that many alone. Never mind all the other bases.



The truth is, they pull from a variety of what's referred to as "application silos", not just 2 separate piles.

I am not doubting what that CP told you but I have to wonder if that number was just a bit inflated? Mine was close to an hour. I am sure some are more in duration and some less. If an hour is about average and your specific CP has done nearly 700, that is a hell of a lot of time taken away from the CP with these things. No real point to this other than the staggering notion of possibly 700 hours of individual CP's time spent on M&G's.
Reply