Originally Posted by
ATOP40
Whats the Captain junior hire date for the E175 in IAH?
Will IAH be one of the 12-18 month upgrade times or does it go more senior due to it being a E175 base?
I think it was a Mar '14 hire for the CA on the Ejet. I think it is going more senior because the flying is possibly better than the CRJ side. Either way, they are quickly running out of qualified pilots to upgrade on either fleet as they take deliveries and attrit.