Originally Posted by
ScottyDo
Slow and steady is the way to go. Another good example is look at PSA. They had a whole bunch of aircraft dropped on them. Now that has become a big old mess and AA is going to slow the rate at which those 700s get moved over there because of it.
False statement. Nothing is a mess. They aren't slowing the rate as PSA is still accepting 3 aircraft a month, whether it be a 900 or a 700. They are delaying 6 aircraft by two months. Who cares. There is no staffing problem. There is a captain problem, which is being rectified. You want to talk about mess, look at Mesas performance. Abysmal.