Originally Posted by
air101
False statement. Nothing is a mess. They aren't slowing the rate as PSA is still accepting 3 aircraft a month, whether it be a 900 or a 700. They are delaying 6 aircraft by two months. Who cares. There is no staffing problem. There is a captain problem, which is being rectified. You want to talk about mess, look at Mesas performance. Abysmal.
It sure sounds like things are a mess over there (PSA). It seems there is a new thread every day talking about what a mess things are. Guys waiting 6 months for IOE, poor pass rates, your union wanting Envoy pilots to come with the aircraft, not being able to fly visual approaches, lack of professionalism, ect. The list goes on. It's all right there in black and white on the 10 different PSA threads. A mess is the best way to describe it.