Thread: Mesa
View Single Post
Old 06-08-2015 | 12:03 AM
  #8612  
Sennant
Gets Weekends Off
 
Joined: Sep 2011
Posts: 688
Likes: 0
Default

Originally Posted by prior121
Incorrect, only way contractually for a CRJ CA to bid E75 CA is if both aircraft have an IAD base and there is a closure of CRJ or bump and flush, allowing a CRJ CA to bid E75 CA if their seniority can hold it to avoid being bumped out of the base.
That would be a contractual way wouldn't it. Statements not incorrect