Originally Posted by
Ray Red
I'm referring to the phase that was just implemented. When does 9E do the "runway pos, dep, first fix" and "final t/o brief (HAA)"?
When I sit on the jumpseat on mainline they verbalized those things during the checklist. We are suppose to do the talking before the checklist is started.
True, but the verbiage requires that it's done before the checklist is complete. Rev 2 (of 4) is in place, but we are "halfway" there
and line vs book are 2 very different metrics (from experience in training and the line). Read the book, do it by the book. Why? Cause our current book says so. 2 revisions down the line, it can all be different. But it's not current book.