View Single Post
Old 01-18-2016 | 03:08 AM
  #73  
Bandit262
New Hire
 
Joined: Nov 2015
Posts: 6
Likes: 0
From: ATL 320A
Default

Originally Posted by Purple Drank
Anyway, back on track.
Jim, is a 3B4 "status quo" grievance in the works? Thanks!
I cannot state that a grievance is "in the works".

However, the issue of the timing of the non-contract employee pay raises (December 1st vs. January 1st) was a topic of discussion at the November MEC meeting, and it IS being investigated.

There is the written word, and there is the "intent" of the written word.

It is not being ignored by the MEC Administration.

Jim Villers
P2P Chairman

Last edited by Bandit262; 01-18-2016 at 03:09 AM. Reason: signature line
Reply