Originally Posted by
K4FE
In general, the large military transports, i.e. C-5, C-141, C-17, do not meet FAR 25 certification standards and the cost of re-design and/or retrofit is prohibitive.
Actually, the C5 (L500), C141 (L300) are FAR 25 A/C. Don't know about the C17.
TH1