Originally Posted by
Dunkin
CLT base will be shrinking while DCA grows, all other bases staying same size.
They did the same thing when they opened CVG. They took lines from CLT to open CVG. They'll likely do the same thing to DCA and then in 4-6 months after it opens CLT will be business as usual.