Thread: Iad 777/787
View Single Post
Old 04-18-2017 | 06:53 PM
  #49  
No Nonsense
Line Holder
 
Joined: Mar 2017
Posts: 35
Likes: 0
Default

Nope! Flying already existences in Base. As soon as pilots activate they can build lines!

8-F Activation Of Assignment
8-F-1 A Pilot’s date of “activation” shall be the date he begins in a new Category and is set by:
8-F-1-a the beginning of the first segment of his OE in that Category;
or 8-F-1-b the beginning of the first segment of his first trip after training for that Category, if OE is not required;
or
8-F-1-c the first day on which he begins a schedule in that new Category, when no training is required.
Reply