View Single Post
Old 09-24-2007 | 09:59 AM
  #22  
sscottky72's Avatar
sscottky72
Line Holder
 
Joined: Mar 2006
Posts: 50
Likes: 0
Default

I am looking to come to Ameriflight with 1200TT in a couple years. I have a wife and 2 kids and I need to get that 1000 twin turbine time as quick as possible. What do you think the typical time frame would be? Is there any chance of flying a cheiftain other than in California? I prefer Billings or SLC!
Reply