Originally Posted by
Inop2
Are the projected flow dates on the ALPA site of any value or BS? My number shows a flow date of 7/22. That would be 6.5 years from hire.
It's a lot more accurate than any salesman that tries to claim a 5 year flow still exists for someone hired today. It's based on flowing the contractual minimum number of pilots per month. It's about as accurate as anyone can be.