View Single Post
Old 06-27-2017, 02:28 PM
  #3787  
Flyby1206
SDQ Base Chief
 
Flyby1206's Avatar
 
Joined APC: Mar 2006
Position: 320 CA
Posts: 5,599
Default

Originally Posted by TristarJS30 View Post
Pay question for everyone:

Was scheduled for a 4 legger the other day. Completed turn one and we were told the second turn was upgraded to a bus and were reassigned to a new city pairing that returned within minutes of the original pairing release time.

The new aircraft was on maintenance and kept with the rolling delays to the point we wouldn't be legal to make the second leg (had a 4:59AM report so we were in the 10 hour FDP range.) Captain had already been extended that week and couldn't extend and I refused.

It was my impression that any change (basically any new flight number or city pairing) would result in an extra 5 hours. Payroll says no dice since we never actually flew the extra legs.

FSM Section G.22 says "actual/scheduled block of additional legs or 5:00, whichever is GREATER."

To me, 5:00 is greater than 0.

Am I wrong?
It was scheduled to finish within your original pairing footprint, which means it doesn't trigger EPS.

Sounds like you would fall under E.5 and get 40% override for Emergency Assignment of the segments (or 5hrs min).
Flyby1206 is online now