Originally Posted by
ajkc114
Once they open up and man the two new bases, it will probably decrease the time to a line, you think? With all those extra lines there's sure to be a shorter wait to get one.
A good deal of the flying in the new bases is supposedly being taken from CLT, at least initially. This could lead to a slight increase in reserve times if lines actually disappear from CLT. Hard to know with summer coming right behind the base openings.
A great deal of the 700/900 flying from the outstations (CVG, TYS, and DAY) looks a lot like CLT flying. The 200 flying tends to be mostly DCA turns with only the originator and terminator at another crew base.