Originally Posted by
terminal
So are we individual contractors now? Is this how we do?
You should’ve let it go through the process...but you got your sweet premium so it’s all good.
Give him a little break. He said how close to departure it was and for SRM
20-H-5-c-(4) Notwithstanding Sections 20-H-5-c-(2) and 20-H-5-c-(3), within four (4) hours of the scheduled Departure time of a Global Trip and
within three and one-half (3.5) hours of the scheduled Departure time of a Basic Trip, the Company may assign the Trip to any volunteering Pilot.