View Single Post
Old 10-18-2018 | 08:44 AM
  #35  
cal73's Avatar
cal73
Redeye avoider
 
Joined: Feb 2008
Posts: 933
Likes: 14
From: 737 Captain
Default

Originally Posted by AV82SKI
There is a new picture hanging up on the A320 bulletin board in IAH. It looks like a picture from a slide at the standards meeting. It shows the fleet growing from 166 to 200 airframes by 2022.



On another note, the last A320 that came from China Southern took 10 months to be converted.


An article I read said that airbus can crank out 44 A320s a month. It takes us 10 months to refurbish one? I know we’re not a manufacturer and that these airplanes may be rode hard and put away wet and all but sheesh. 10 months? Sounds like either we’re not really interested in getting these things on line or somebody is taking a few too many trips to the ole blue room.
Reply