Originally Posted by
Busdriver320
I meant under the NavBlue pbs system, not current line builds.
Will it award 2+2 or 1+4, or 3+2, etc etc or is it looking for 4 days off between every individual trip?
We can fly up to 6 consecutive days. So if PBS needs to, it will build 6 days of flying in whichever fashion it needs to. Then we are required to have a minimum of 4(5) days off. So essentially we can do these back to back trips not to exceed 6 days.
Hope this clears it up for ya